Skip to main content
Parc fotovoltaic

3.1 MW photovoltaic park – Drăgsina, Timișoara

GX-TRADE BUSINESS MANAGEMENT SRL has completed a photovoltaic park with an installed capacity of 3.1 MW in the town of Drăgsina, Timiș County. The project included the complete stages of consultancy, design and execution of electrical systems, ensuring optimal integration into the national grid. The investment significantly contributes to the production of renewable energy and to supporting the transition to sustainable energy consumption in the region.

750 kW photovoltaic park – Târgu Jiu (2024)

GX-TRADE BUSINESS MANAGEMENT SRL built a photovoltaic park with an installed capacity of 750 kW in Târgu Jiu in 2024. The project included consultancy, complete design and execution of electrical systems, according to regulations and grid connection requirements. The investment supports renewable energy production and sustainable development at the local level.

Parc fotovoltaic

Photovoltaic park 836 kW – Arad

GX-TRADE BUSINESS MANAGEMENT SRL carried out a photovoltaic project with an installed capacity of 836 kW in Arad County. The work included technical consultancy, complete design and execution for the electrical systems, respecting the standards in force and the requirements for connection to the national grid. The project ensures the production of green and efficient energy, contributing to reducing the carbon footprint and increasing energy independence.

Continue reading

4 MW photovoltaic park – Nojorid, Bihor

GX-TRADE BUSINESS MANAGEMENT SRL is currently developing a photovoltaic park with a capacity of 4 MW in the commune of Nojorid, Bihor county. The project is in the construction phase and includes full consultancy, design and execution services for electrical systems. The investment will contribute to increasing green energy production at the regional level and to strengthening energy independence through the use of renewable resources.